Showing posts with label Home Improvement. Show all posts
Showing posts with label Home Improvement. Show all posts

Wednesday, November 28, 2012

Play Room Remodel - Paper Bag Floor


We live in a tri-level house, which means you walk into the house on the kitchen/Living room level, go up 9 stairs for the bedrooms and go down 5 stairs for the "basement". The basement is barely below grade and sits on a concrete slab. The previous owners used this as their family room/den, but we've used it as the playroom. It's a fairly large room and I can see down into it from my kitchen. So, it was the perfect place for the kids to play while I kept an eye on them. The room came with old beige carpet, which was better than the orange shag that was upstairs, but wasn't in great condition.

Took this picture the day we moved in when the 10 year old was 3.


About a month ago, I got a spurt of energy and decided it was time for the carpet to go. So I spent a few days ripping out carpet one 4 foot strip at a time, scraped up the padding glue, and chiseled up the tack strips.


Once the carpet was gone I decided that was the perfect time to scrape the popcorn off the ceiling and repaint everything!

Once the ceiling and walls were freshly painted, I went to work on the floor. In order to add some warmth and texture to the room, I decided to put down a paper bag floor. I gathered about 100 bags from friends, ripped them up into pieces, soaked them in a 50/50 solution of white glue and water then smoothed them down onto the floor. After the bags were dry I put down 4-6 coats of polyurethane to protect them (some areas have more coats than others). Some of the grocery bags had pictures I liked; so I turned those pictures face up to decorate the floor. All the rest I turned face down to make the background.
 

 
 

After the floor was finished, Hubby put new baseboards around the room and we were done!

The whole thing took me about 3 weeks to do from moving furniture, tearing up carpet, scraping the ceiling, painting the walls, putting down the new floor and putting on the baseboards, but I think it was time well spent!



All together I spent about $250 for the whole room makeover. That included 2 gallons of polyurethane, a gallon of glue and 70 feet of baseboards. The paint we used for the walls was mixed up leftover paint from previous projects along with one can of oops paint from home depot ($7). And the bags were all donated by friends! In one corner the kids even drew a picture, wrote their name and dated it. I guess it's a little like putting your hand prints in wet cement. :)

 
 





Thursday, January 12, 2012

Taming the Office Mess

Hi, my name is Angie, and I have a messy office. I'm pretty good about keeping the rest of the house (except the kids' playroom) fairly neat and tidy, but my office is always a mess. I'm not a fan of clutter and feel like my brain gets cluttered when my house is cluttered, but up until now I've not been able to figure out a way to tame the office mess.

Yesterday I got a bee in my bonnet and headed to Target for some de-cluttering supplies. Back at home with shelving in hand, I rearranged my office, threw out a lot of stuff I just don't need anymore and hid the clutter in these neat little fabric cubes. I dug out a couple of decorative baskets and buckets I had holding other junk and re-purposed them as office junk holders. :) One fabric bin is still empty, so I've got some expansion possibilities if more office junk appears. I think it turned out quite nice...and I still know where everything is!

Shelving cost: $19.99 for shelving unit + $7 each for the fabric bins = $48

Before

(actually about 1/4 of the way through. I'd already removed the non-working computer from the corner and moved my sewing machine and chair out of the way)



After

Wednesday, June 1, 2011

Wacky Wednesday

We are in the middle of a master bathroom remodel. The drywall is down, the tile floor is up and the shower is in pieces in my garage. All of this happened over this past long weekend. After a day of Hubby and I banging away, the kids wanted to help. So on Monday, in their PJ's,  they put on their dust masks, grabbed a hammer and got to work on the remaining drywall. They soon realized that drywall is dusty and the dust irritates your eyes. They didn't like the safety goggles I offered them, but thought of a pretty good idea to solve the problem. The resulting picture was too funny not to share.


Yes, those are swim goggles.

Here are a couple of pictures of our gutted bathroom.
 This was 3/4 through the tile removing process. Turns out the way to remove floor tile is to beat the dickens out of it with a hammer until you can sweep it away. Who knew?

There used to be a shower here.

Saturday, April 16, 2011

Adios to the Driveway Lake

Our driveway is a fairly long gravel drive with a dip and a 90 degree turn about halfway along. Every time it rains this dip becomes our own personal lake. And given the fact that we live in the Pacific Northwest, that's a lot of rain and a perpetual lake. Also, when it snows or is icy, trying to get up the dip and then the slope of our driveway without getting a running start is impossible. This year I finally got tired of it and called a company to come fill in our lake. They brought in about 3 dump truck loads of gravel to raise the dip by about 2 feet to meet the driveway on either side. So far I think the fix is working! It rained aardvarks and elephants the other day and there's no lake! That's one problem solved...now to move on to the rest of the list.




Tuesday, April 13, 2010

First Lettuce of the season

For Easter dinner this year along with the Ham and carrots I made in the crock pot, we ate the first lettuce of the season. I started some seed a couple of months ago in the greenhouse and the lettuce is now big enough to nibble. I thinned my lettuce pot and we ate the thinnings. Hopefully the plants left in the pot will continue to grow and become full heads to eat in a couple more months. Everything is growing pretty slowly due to the cold temps outside, but it is all still growing.

I now have starts of Lettuce, spinach, green cabbage (need to start some red cabbage), leeks, scallions, peas, red beets (need to start some golden ones), butternut squash, zucchini, sunflowers and another flower I can't remember. I'll seed the corn, pole beans, soy beans and pumpkins directly in the garden when I get it weeded. What am I forgetting? I've gotten 2 out of 14 rows weeded so far, and will hopefully get a lot more done in the nice weather predicted for this weekend.

This past weekend we went to the Tulip Festival and worked outside cleaning up the rest of the old deck. The new deck is about 95% finished, and now the old deck is 100% removed. We cleared about 150 sq feet of woods behind the chicken coop to stack the spare good lumber and stacked the "bad" lumber behind the compost pile. It'd probably be better just to get a dumpster and throw out the old lumber, but in the back of my mind I keep thinking that there must be something we can make out of it. One section of the old deck is now in our "Secret Trees" where the kids play. They're using as a stage. :)

Now I just need to figure out what to do with about 400 sq ft of empty space off the end of the new deck...Hot Tub?

Monday, November 2, 2009

Deck in progress

When we moved into our house 3.5 years ago it came with a long somewhat narrow freshly painted deck off of the back of the house. We loved our deck and had many meals on it, hosted parties that gathered on it and even put wadding pools on it in the summer for the kids. But after a couple of years we noticed that the paint was peeling and in some spots the boards were starting to get soft. This past summer this got really bad, and before any gathering I had to go jump on the deck to see if any of the boards were rotten. On a couple of occasions I even put my foot through the deck. Then Hubby would have to go scrounge some scrap 2x4s to patch the hole. It was time to replace the deck!

So I called a few companies for quotes on expanding and fixing our beloved deck. Some quotes were fairly high and didn't really give me exactly what I wanted, and most of them didn't include replacing the underlying structure of the existing deck, just re-decking the surface boards. Other companies didn't even get back to me with a quote at all...I guess if you're not putting in a huge composite deck they don't really want your business. So after much thought, Hubby decided to just replace the deck himself. He ordered the lumber online, had it delivered and even got the contractor rate because the order was so large. Then the tear out started. He wasn't sure what he'd find when he tore off the top boards and thought that the structure might be in good shape, but that's not what he found. Basically, the deck seemed to be built out of lumber that really wasn't supposed to be used outside, and then got painted to "seal" it for outdoor use. The top boards as well as all of the underlying structure was rotten and just waiting to collapse. So it all got torn out and thrown on the scrap pile.

















Now we're a few weeks into the re-build of the deck and it's looking really nice! The structure probably took the most time to build, and now the decking boards are going on really quickly. Stairs will come next and after that we'll think about railings on a couple of high places. But I'm really pleased with it. We almost doubled the width of the deck in the middle and added on a long section next to the house. The funny shaped section at the end under the trees will most likely not be re-built. I'm thinking of putting a paved patio there or using it as a garden space...or something I haven't thought of yet. And by having hubby do it himself I think we probably saved about $5k in labor costs. Yay!